Plot the load-duration curves and the price-duration curve for the power system in the region

Determine if there is a mechanism to encourage the provision of generation capacity in the region where you live (or in another region for which you have access to sufficient information).

Summarize the regulatory process used for transmission expansion in your region or country, or in another area for which you have access to sufficient information. Identify the method used to allocate the cost of transmission investments in your region or country, or in another area for which you have access to sufficient information.

Plot the load-duration curves and the price-duration curve for the power system in the region where you live or another system for which you have access to the necessary data. Compare the peak demand to the installed generation capacity in the system.

My Homework Nest
Calculate your paper price
Pages (550 words)
Approximate price: -